Application documents
The different sections of our Development Consent Order application, which was accepted by the IPC on 19 December 2011, can be found below:
GWF Environmental Statement:
- ES Non-Technical Summary
- ES Chapter 1: Introduction
- ES Chapter 2: Project Need, Policy Framework and Guidance
- ES Chapter 3: Legislative and Planning Context
- ES Chapter 4: EIA Process
- ES Chapter 5: Project Details
- ES Chapter 6: Site Selection and Alternatives
- ES Chapter 7: Consultation
- ES Chapter 8: Nature and Conservation Designations
- ES Chapter 9: Physical Environment
- ES Chapter 10: Marine and Water Sediment Quality
- ES Chapter 11: Ornithology
- ES Chapter 12: Marine and Intertidal Ecology
- ES Chapter 13: Fish and Shellfish Resource
- ES Chapter 14: Marine Mammals
- ES Chapter 15: Commercial Fisheries
- ES Chapter 16: Shipping and Navigation
- ES Chapter 17: Military and Civil Aviation
- ES Chapter 18: Other Human Activity
- ES Chapter 19: Archaeology
- ES Chapter 20: Seascape Landscape and Visual Character
- ES Chapter 21: Socioeconomics
- ES Chapter 22: Geology Hydrogeology Land Quality and Flood Risk
- ES Chapter 23: Terrestrial Ecology
- ES Chapter 24: Land Use Tourism and Recreation
- ES Chapter 25: Traffic and Transport
- ES Chapter 26: Noise
- ES Chapter 27: Air Quality
- ES Chapter 28: Electric and Magnetic Fields
- ES Chapter 29: Inter Relationships
- ES Chapter 30: Cumulative Impact Assessment
- ES Chapter 31: Transboundary Effects
- ES Chapter 32: Conclusions
- ES Glossary
- ES Annexe Onshore Outline CCOP
- ES Annexe Decommissioning Statement
- ES Appendices: Technical Appendix 1 (Part 1)
- ES Appendices: Technical Appendix 1 (Part 2)
- ES Appendices: Technical Appendix 2
- ES Appendices: Technical Appendix 3 (Part 1)
- ES Appendices: Technical Appendix 3 (Part 2)
- ES Appendices: Technical Appendix 4 (Part 1)
- ES Appendices: Technical Appendix 4 (Part 2)
- ES Appendices: Technical Appendix 5 (Part 1)
- ES Appendices: Technical Appendix 5 (Part 2)
- ES Appendices: Technical Appendix 6 (Part 1)
- ES Appendices: Technical Appendix 6 (Part 2)
Plans:
- Order Limits Plan Onshore
- Order Limits Plan Offshore
- Works Plan Onshore Omitting Works 7
- Works Plan Onshore Omitting Works 8
- Works Plan Offshore
- Land Plan Onshore Including Crown Land
- Land Plan Offshore Including Crown Land (part 2)
- General Arrangement Onshore
- Height Restriction Plan
- Onshore Connection and Transmission Works General Arrangement Omitting Works 8
- Onshore Connection and Transmission Works General Arrangement Omitting Works 7
- Transmission Compound General Arrangement and elevations
- Galloper Wind Farm Compound Illustrative Layout
- Galloper Wind Farm Compound Illustrative Elevation
- Sealing End Compounds Illustrative Plan and Layout
- Wind Turbine Illustrative 120m Rotor
- Offshore Substation Topside Illustrative Plan
- Offshore Substation Topside Illustrative Elevation
- Met Mast Topside Illustrative Plan and Elevation
- Transition Bay Illustrative Plan and Section
- Connection Works Illustrative Ducted 132kV
- Transmission Works Illustrative 132 400kV Cross Section
- Extinguishment of Rights of Navigation Plan
Application Form Functions:
Draft Development Consent Order:
Reports:
- Consultation Report
- Consultation Report Appendices A to Z
- Consultation Report Appendices AA to AV
- Habitat Regulations Report
- Habitat Regulations Report Checklist
- Flood Risk Assessment
- Statement of Engagement
Associated Development Information:
Additional Information Reg 6:
Compulsory Purchase Information:
- Statement of Reasons
- Statement of Reasons (Schedule 1)
- Funding Statement
- Book of Reference
- Section 127 Application
Other documents:
- Cover Letter to Galloper Wind Farm Application
- Copies of Newspaper Notices
- Planning Statement
- Design and Access Statement
- Draft Heads of Terms for Section 106 Agreement
- Scoping Opinion
Other documents not forming part of the application
Appendix 20.B of the Environmental Statement (Doc 5.4.5 of the Application) lists a number of figures which were inadvertently omitted from the submission, namely Figures 01 to 10, Wireframe figures 2842/WF/01 to 08, Photomontage figures 2842/PM/01 to 08, Cumulative wireframe figures 2842/WF-C/03 and 07 and Cumulative photomontage figures 2842/PM-C/03 and 07.
Links to these figures are available below. However please note that, as they did not form part of the submission to the IPC, they do not, at this time, form part of the application and are provided here for information only. It is, however, anticipated that these omitted figures will be formally submitted to the IPC at a later date.
Appendix 20.B Wireframe 2842/WF/01
Appendix 20.B Wireframe 2842/WF/02
Appendix 20.B Wireframe 2842/WF/03
Appendix 20.B Wireframe 2842/WF/04
Appendix 20.B Wireframe 2842/WF/05
Appendix 20.B Wireframe 2842/WF/06
Appendix 20.B Wireframe 2842/WF/07
Appendix 20.B Wireframe 2842/WF/08
Appendix 20.B Photomontage 2842/PM/01
Appendix 20.B Photomontage 2842/PM/02
Appendix 20.B Photomontage 2842/PM/03
Appendix 20.B Photomontage 2842/PM/04
Appendix 20.B Photomontage 2842/PM/05
Appendix 20.B Photomontage 2842/PM/06
Appendix 20.B Photomontage 2842/PM/07
Appendix 20.B Photomontage 2842/PM/08
Appendix 20.B Cumulative wireframe figures 2842/WF-C/03 and 07
Appendix 20.B Cumulative photomontage figures 2842/PM-C/03 and 07
Furthermore, when accepting the GWF Development Consent Order application, the IPC provided accompanying advice to GWFL. This included comments on GWFL 's submitted offshore plans. Whilst accepting the practical challenges associated with preparing plans of large offshore projects, the IPC noted that offshore plans should normally be prepared at 1:2500 scale at no greater than A0 size.
In response to the IPC 's comments, GWFL has prepared a full set of sheets comprising the Offshore Works Plan below, to assist readers of the application with clarification of aspects in relation to the Order Limits and Works items. However please note that the plans below are not part of the application documents and have not been submitted to the IPC. In the event of any discrepancy between the clarification plans (prefixed C) and the application plans, the application plans prevail. Please note that, in addition to utilising a larger scale, the Works Plan clarification sheets below include additional information in the form of point numbers reflected in the draft Development Consent Order.
The grid coordinates for all of the boundaries shown on these plans are set out in full in the draft Development Consent Order, which forms part of the application documents.
C2.4_Works_Plan_Offshore_(Clarification)_-_Overview
C2.4-1_Works_Plan_Offshore_(Clarification)_-_Sheet_1
C2.4-2_Works_Plan_Offshore_(Clarification)_-_Sheet_2
C2.4-3_Works_Plan_Offshore_(Clarification)_-_Sheet_3
C2.4-4_Works_Plan_Offshore_(Clarification)_-_Sheet_4
C2.4-5_Works_Plan_Offshore_(Clarification)_-_Sheet_5
C2.4-6_Works_Plan_Offshore_(Clarification)_-_Sheet_6
C2.4-7_Works_Plan_Offshore_(Clarification)_-_Sheet_7
C2.4-8_Works_Plan_Offshore_(Clarification)_-_Sheet_8
C2.4-9_Works_Plan_Offshore_(Clarification)_-_Sheet_9
C2.4-10_Works_Plan_Offshore_(Clarification)_-_Sheet_10
C2.4-11_Works_Plan_Offshore_(Clarification)_-_Sheet_11
C2.4-12_Works_Plan_Offshore_(Clarification)_-_Sheet_12
C2.4-13_Works_Plan_Offshore_(Clarification)_-_Sheet_13
C2.4-14_Works_Plan_Offshore_(Clarification)_-_Sheet_14
C2.4-15_Works_Plan_Offshore_(Clarification)_-_Sheet_15
C2.4-16_Works_Plan_Offshore_(Clarification)_-_Sheet_16
C2.4-17_Works_Plan_Offshore_(Clarification)_-_Sheet_17
C2.4-18_Works_Plan_Offshore_(Clarification)_-_Sheet_18
C2.4-19_Works_Plan_Offshore_(Clarification)_-_Sheet_19
C2.4-20_Works_Plan_Offshore_(Clarification)_-_Sheet_20
C2.4-21_Works_Plan_Offshore_(Clarification)_-_Sheet_21
C2.4-22_Works_Plan_Offshore_(Clarification)_-_Sheet_22
C2.4-23_Works_Plan_Offshore_(Clarification)_-_Sheet_23
C2.4-24_Works_Plan_Offshore_(Clarification)_-_Sheet_24
C2.4-25_Works_Plan_Offshore_(Clarification)_-_Sheet_25
C2.4-26_Works_Plan_Offshore_(Clarification)_-_Sheet_26
C2.4-27_Works_Plan_Offshore_(Clarification)_-_Sheet_27
C2.4-28_Works_Plan_Offshore_(Clarification)_-_Sheet_28
C2.4-29_Works_Plan_Offshore_(Clarification)_-_Sheet_29
C2.4-30_Works_Plan_Offshore_(Clarification)_-_Sheet_30
C2.4-31_Works_Plan_Offshore_(Clarification)_-_Sheet_31
C2.4-32_Works_Plan_Offshore_(Clarification)_-_Sheet_32
C2.4-33_Works_Plan_Offshore_(Clarification)_-_Sheet_33
C2.4-34_Works_Plan_Offshore_(Clarification)_-_Sheet_34
C2.4-35_Works_Plan_Offshore_(Clarification)_-_Sheet_35
C2.4-36_Works_Plan_Offshore_(Clarification)_-_Sheet_36
C2.4-37_Works_Plan_Offshore_(Clarification)_-_Sheet_37
C2.4-38_Works_Plan_Offshore_(Clarification)_-_Sheet_38
C2.4-39_Works_Plan_Offshore_(Clarification)_-_Sheet_39
C2.4-40_Works_Plan_Offshore_(Clarification)_-_Sheet_40
C2.4-41_Works_Plan_Offshore_(Clarification)_-_Sheet_41
C2.4-42_Works_Plan_Offshore_(Clarification)_-_Sheet_42
C2.4-43_Works_Plan_Offshore_(Clarification)_-_Sheet_43
C2.4-44_Works_Plan_Offshore_(Clarification)_-_Sheet_44
C2.4-45_Works_Plan_Offshore_(Clarification)_-_Sheet_45
C2.4-46_Works_Plan_Offshore_(Clarification)_-_Sheet_46
C2.4-47_Works_Plan_Offshore_(Clarification)_-_Sheet_47
C2.4-48_Works_Plan_Offshore_(Clarification)_-_Sheet_48
C2.4-49_Works_Plan_Offshore_(Clarification)_-_Sheet_49
C2.4-50_Works_Plan_Offshore_(Clarification)_-_Sheet_50
C2.4-51_Works_Plan_Offshore_(Clarification)_-_Sheet_51
C2.4-52_Works_Plan_Offshore_(Clarification)_-_Sheet_52
C2.4-53_Works_Plan_Offshore_(Clarification)_-_Sheet_53
C2.4-54_Works_Plan_Offshore_(Clarification)_-_Sheet_54
C2.4-55_Works_Plan_Offshore_(Clarification)_-_Sheet_55
C2.4-56_Works_Plan_Offshore_(Clarification)_-_Sheet_56
C2.4-57_Works_Plan_Offshore_(Clarification)_-_Sheet_57
C2.4-58_Works_Plan_Offshore_(Clarification)_-_Sheet_58
C2.4-59_Works_Plan_Offshore_(Clarification)_-_Sheet_59
C2.4-60_Works_Plan_Offshore_(Clarification)_-_Sheet_60
C2.4-61_Works_Plan_Offshore_(Clarification)_-_Sheet_61
C2.4-62_Works_Plan_Offshore_(Clarification)_-_Sheet_62
C2.4-63_Works_Plan_Offshore_(Clarification)_-_Sheet_63
C2.4-64_Works_Plan_Offshore_(Clarification)_-_Sheet_64
C2.4-65_Works_Plan_Offshore_(Clarification)_-_Sheet_65
C2.4-66_Works_Plan_Offshore_(Clarification)_-_Sheet_66
C2.4-67_Works_Plan_Offshore_(Clarification)_-_Sheet_67
C2.4-68_Works_Plan_Offshore_(Clarification)_-_Sheet_68
C2.4-69_Works_Plan_Offshore_(Clarification)_-_Sheet_69
C2.4-70_Works_Plan_Offshore_(Clarification)_-_Sheet_70
C2.4-71_Works_Plan_Offshore_(Clarification)_-_Sheet_71
C2.4-72_Works_Plan_Offshore_(Clarification)_-_Sheet_72
C2.4-73_Works_Plan_Offshore_(Clarification)_-_Sheet_73
C2.4-74_Works_Plan_Offshore_(Clarification)_-_Sheet_74
C2.4-75_Works_Plan_Offshore_(Clarification)_-_Sheet_75
C2.4-76_Works_Plan_Offshore_(Clarification)_-_Sheet_76
C2.4-77_Works_Plan_Offshore_(Clarification)_-_Sheet_77
C2.4-78_Works_Plan_Offshore_(Clarification)_-_Sheet_78
C2.4-79_Works_Plan_Offshore_(Clarification)_-_Sheet_79
Join our mailing list
Sign up to receive the latest news and updates on the project by email.
Contact us
You can contact Chris Harris, Community Liaison Manager for Galloper Wind Farm on 07500 912002 or by email.

